logo

Danville Data Center Development Rules

Sector: Water Supply and Storage • Location: Danville, Virginia, United States

Source: WSET

Project
Planned

Danville city leaders are establishing strict rules for potential future data center projects. The rules specify location requirements, operational limits, and infrastructure needs, including a minimum of 150 acres, prohibition in industrial parks, a 500-foot buffer from homes, indoor equipment, and adherence to noise regulations. The only suitable location identified is near the Goodyear site, wh

Status
Prospective
Sector
Water Supply and Storage, Data Center, Manufacturing (Industrial), Power Generation (CCGT)
Location
Danville, Virginia, United States of America
Updated
22 Jul 2026
Source
WSET

ConstructChat

Ask ConstructChat about Danville Data Center Development Rules

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Danville Data Center Development Rules” is an infrastructure initiative in the Water Supply and Storage sector, located in Danville, Virginia, United States. Taiyo aggregates data on it from WSET.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Danville city leaders are establishing strict rules for potential future data center projects. The rules specify location requirements, operational limits, and infrastructure needs, including a minimum of 150 acres, prohibition in industrial parks, a 500-foot buffer from homes, indoor equipment, and adherence to noise regulations. The only suitable location identified is near the Goodyear site, which requires a new power substation and water capacity upgrades that could take 2-3 years. The city council is expected to vote on these rules on May 5, 2026.

Original sector

Technology Infrastructure

Location

Country

United States of America (USA)

State

Virginia

City

Danville

Source

Source

WSET

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2026-04-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project