Dar Es Salaam Bus Rapid Transit infrastructure Phase 5 Package A project
One of 66 projects Taiyo tracks in Dar es Salaam.
Source: InfraPPPWorld
The project involves the construction of Phase 5 Package A of the Dar Es Salaam Bus Rapid Transit (BRT) infrastructure in Tanzania.The package is divided into two lots as follows:Lot 1: Road works (19.3 Km), 20 conventional bus stations and two pedestrian bridgeLot 2: Road works (9.4km) and 12 conventional bus stationsThe project consists of upgrading the existing road from 2 lanes to 4 lanes, con
- Status
- Under Construction
- Sector
- Stadium, Waste Processing and Treatment, Road, Government
- Location
- Dar es Salaam, Tanzania
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Dar Es Salaam Bus Rapid Transit infrastructure Phase 5 Package A project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of Phase 5 Package A of the Dar Es Salaam Bus Rapid Transit (BRT) infrastructure in Tanzania.The package is divided into two lots as follows:Lot 1: Road works (19.3 Km), 20 conventional bus stations and two pedestrian bridgeLot 2: Road works (9.4km) and 12 conventional bus stationsThe project consists of upgrading the existing road from 2 lanes to 4 lanes, construction of embankments, drainage structures involving bridges, box culverts, pipe culverts and pavement layers, and ancillary works. Phase 5, Package B includes Lot 3 which focuses on constructing buildings at various locations, including Temek Depot, Tabata Barakuda (Sigara) Depot, and National Stadium Depot, as well as terminals and feeder stations. |
Original sector | Transport |
Location
Country | Tanzania |
State | Dar es Salaam |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Stadium, Waste Processing and Treatment, Road, Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
