logo
ProjectActive

Dar es Salaam Maritime Gateway Project

Sector: Rail • Location: Tanzania

Source: World Bank

The development objective of the Dar es Salaam Maritime Gateway Project for Tanzania is to improve the effectiveness and efficiency of the Port of Dar es Salaam for the benefit of public and private stakeholders. The project development objective (PDO) will be realized by the following two components: (i) Component 1: Improving the Physical Infrastructure; and Component 2: Institutional Strengthe

Status
Prospective
Sector
Rail, Seaport, Forest Products and Packaging, Commercial, Government
Location
Tanzania
Updated
19 Nov 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Dar es Salaam Maritime Gateway Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dar es Salaam Maritime Gateway Project” is an infrastructure initiative in the Rail sector, located in Tanzania. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The development objective of the Dar es Salaam Maritime Gateway Project for Tanzania is to improve the effectiveness and efficiency of the Port of Dar es Salaam for the benefit of public and private stakeholders. The project development objective (PDO) will be realized by the following two components: (i) Component 1: Improving the Physical Infrastructure; and Component 2: Institutional Strengthening and Implementation Assistance. The DSMGP has been developed as a multi-development partner initiative to improve the effectiveness and efficiency of the Port of Dar es Salaam. The first component comprises the essential civil works in the port, and the key access infrastructure: a) Deepening and strengthening of existing Berths 1 to 7 to 14.5 m below Chart Datum (CD), and constructing a new multipurpose berth at Gerezani Creek; b) Deepening and widening the entrance channel and turning basin in the port to the end of Berth 11 to 15.5 m below CD; c) Improving the rail linkages and platform in the port;27 and d) Deepening and strengthening of existing Berths 8-11, to 14.5m below CD; The second component comprises the following two sub-components: i) The Institutional Strengthening of Tanzania Ports Authority (TPA) - Technical assistance to support the restructuring of TPA to reflect the twin objectives of corporatization of functional business units under TPA for those berths where TPA will remain the operator, whilst enhancing TPA’s capacity to act as a landlord, manager and developer of the ports in Tanzania; and assess future private sector participation; (b) Capacity building/training for TPA staff to take on the above responsibilities, as a result of the restructuring, including inter alia necessary support to implement the Environmental and Social Strengthening Plan (ESSP) and obtain the ISO 14001 Certificate, and building capacity and awareness of climate resilience; and (c) Procurement of management information systems, Terminal Operating Systems for those berths where TPA will remain the operator, and a Port Community System for Dar es Salaam port; ii) Implementation Assistance - (a) Supervision of construction and dredging works in the port;(b) Technical Assistance, as required, to the TPA PIT to facilitate the implementation of the project (including TA to supervise the implementation of the cost accounting manual); (c) Independent technical auditor; and (d) Technical Assistance to update the National Port Master-plan to guide the strategic development of the maritime sector and its hinterland in Tanzania.

Original sector

FY17 - Industry, Trade and Services,FY17 - Transportation

Budget

Location

Country

Tanzania

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Rail, Seaport, Forest Products and Packaging, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project