DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2
Sector: Water Supply and Storage • Location: Tanzania
Source: World Bank Group
The objective of the Second Phase of the Dar Es Salaam Metropolitan Development Project for Tanzania is to improve climate resilient urban infrastructure and services and strengthen institutional capacity in the Dar es Salaam Region. There are five components to the project, the first component being climate-smart priority infrastructure. This component includes four subcomponents: resilient trans
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of the Second Phase of the Dar Es Salaam Metropolitan Development Project for Tanzania is to improve climate resilient urban infrastructure and services and strengthen institutional capacity in the Dar es Salaam Region. There are five components to the project, the first component being climate-smart priority infrastructure. This component includes four subcomponents: resilient transport infrastructure, resilient and green drainage systems, resilient parks, public spaces, riparian and coastal landscapes, and area-based urban development. The second component is the integrated solid waste management infrastructure and services. This component includes four subcomponents: waste disposal, waste transfer and transport, waste recycling and organic waste management, and establishment of Intermunicipal solid waste management institution. The third component is the strengthening urban institutions. This component will support improved urban services, municipal finances, urban planning and emergency planning and response. This component includes four subcomponents: capacity building for resilient urban services, implementation of Own Source Revenue (OSR) management system, capacity building for resilient urban planning, and capacity building for emergency planning and response. The fourth component is the project management. This component will finance the direct costs of management and operation of the project to ensure smooth delivery and compliance with World Bank policy and guidelines. Finally, the fifth component is the contingency emergency response. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- DAR ES SALAAM WATER SUPPLY&SANITATION
- Silverlands Tanzania Limited
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
