DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objective of the Second Phase of the Dar Es Salaam Metropolitan Development Project for Tanzania is to improve climate resilient urban infrastructure and services and strengthen institutional capacity in the Dar es Salaam Region. There are five components to the project, the first component being climate-smart priority infrastructure. This component includes four subcomponents: resilient trans
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Second Phase of the Dar Es Salaam Metropolitan Development Project for Tanzania is to improve climate resilient urban infrastructure and services and strengthen institutional capacity in the Dar es Salaam Region. There are five components to the project, the first component being climate-smart priority infrastructure. This component includes four subcomponents: resilient transport infrastructure, resilient and green drainage systems, resilient parks, public spaces, riparian and coastal landscapes, and area-based urban development. The second component is the integrated solid waste management infrastructure and services. This component includes four subcomponents: waste disposal, waste transfer and transport, waste recycling and organic waste management, and establishment of Intermunicipal solid waste management institution. The third component is the strengthening urban institutions. This component will support improved urban services, municipal finances, urban planning and emergency planning and response. This component includes four subcomponents: capacity building for resilient urban services, implementation of Own Source Revenue (OSR) management system, capacity building for resilient urban planning, and capacity building for emergency planning and response. The fourth component is the project management. This component will finance the direct costs of management and operation of the project to ensure smooth delivery and compliance with World Bank policy and guidelines. Finally, the fifth component is the contingency emergency response. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Open for FDI through a majority stake/Establishment of storage or distribution/sales outlet/Manufacture of tanks, reservoirs and containers of metal/EDCOM LIMITED
