logo

Dar es Salaam–Mwanza Standard-Gauge Railway Line Sections 3 and 4

One of 3,550 projects Taiyo tracks in Tanzania.

Source: Railway PRO

Project
Under Construction

A new standard-gauge railway line in Tanzania connecting Dar es Salaam on the east coast with Lake Victoria in the interior. Sections 3 and 4, Makutupora–Tabora and Tabora–Isaka, totaling 424 km, are under construction. Vossloh is supplying switches and fastening systems for these sections.

Status
Under Construction
Sector
Mass Transit, Rail
Location
Tanzania
Updated
22 Jul 2026
Source
Railway PRO

ConstructChat

Ask ConstructChat about Dar es Salaam–Mwanza Standard-Gauge Railway Line Sections 3 and 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dar es Salaam–Mwanza Standard-Gauge Railway Line Sections 3 and 4” is an infrastructure initiative in the Mass Transit sector, located in Tanzania. Taiyo aggregates data on it from Railway PRO.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new standard-gauge railway line in Tanzania connecting Dar es Salaam on the east coast with Lake Victoria in the interior. Sections 3 and 4, Makutupora–Tabora and Tabora–Isaka, totaling 424 km, are under construction. Vossloh is supplying switches and fastening systems for these sections.

Original sector

Railway

Budget

Location

Country

Tanzania

Source

Source

Railway PRO

URL

More Details

Record type

Project

Sector

Mass Transit, Rail

Article published date

2026-04-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project