Dardanelos Hydro Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In October 2006, Energetica Aguas da Pedra, which was formed by state-owned Eletronorte(24.5%), Neoenergia (51%), and state-owned Chesf (24.5%), was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 261 MW hydro power plant located in the Aripuana River, state of Mato Grosso. Besides Energetica Aguas da Pedra, on
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Water Supply and Storage, Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Dardanelos Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In October 2006, Energetica Aguas da Pedra, which was formed by state-owned Eletronorte(24.5%), Neoenergia (51%), and state-owned Chesf (24.5%), was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 261 MW hydro power plant located in the Aripuana River, state of Mato Grosso. Besides Energetica Aguas da Pedra, only one company took part in the bidding contest: the Brazilian Fuad Rassi. The bidding criteria set by the federal regulatory agency ANEEL was the highest amount to be paid for the right to undertake the project. The winning bid was for US$ 0.540 million (BRL 0.988 million) to be paid in yearly installments for the duration of the contract, starting from the year in which operations commence (using a 10% discount rate, the present value of these contributions was estimated at US$ 122.5 million). The contract was signed in June 2007, and Energetica Aguas da Pedra was set to lead the project during the 35-year contract period. The sponsor committed to invest US$ 407.1 million (BRL 745 million) in the power plant. Financial closure was achieved in October 2008, when the sponsor was granted a US$ 265 million (BRL 485 million) loan from BNDES. The remaining cost was financed with the sponsors’ internal resources. The construction works were undertaken by the Brazilian company Odebrecht. Construction works started in August 2007, and operations commenced in August 2011. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Water Supply and Storage, Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
