logo

Dardanelos Hydro Power Plant

Sector: Government • Location: Brazil

Source: World Bank Group

Project
Active

In October 2006, Energetica Aguas da Pedra, which was formed by state-owned Eletronorte(24.5%), Neoenergia (51%), and state-owned Chesf (24.5%), was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 261 MW hydro power plant located in the Aripuana River, state of Mato Grosso. Besides Energetica Aguas da Pedra, on

Status
Prospective
Sector
Government, Water Supply and Storage, Hydro, Power Generation (CCGT), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dardanelos Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dardanelos Hydro Power Plant” is an infrastructure initiative in the Government sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 2006, Energetica Aguas da Pedra, which was formed by state-owned Eletronorte(24.5%), Neoenergia (51%), and state-owned Chesf (24.5%), was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 261 MW hydro power plant located in the Aripuana River, state of Mato Grosso. Besides Energetica Aguas da Pedra, only one company took part in the bidding contest: the Brazilian Fuad Rassi. The bidding criteria set by the federal regulatory agency ANEEL was the highest amount to be paid for the right to undertake the project. The winning bid was for US$ 0.540 million (BRL 0.988 million) to be paid in yearly installments for the duration of the contract, starting from the year in which operations commence (using a 10% discount rate, the present value of these contributions was estimated at US$ 122.5 million). The contract was signed in June 2007, and Energetica Aguas da Pedra was set to lead the project during the 35-year contract period. The sponsor committed to invest US$ 407.1 million (BRL 745 million) in the power plant. Financial closure was achieved in October 2008, when the sponsor was granted a US$ 265 million (BRL 485 million) loan from BNDES. The remaining cost was financed with the sponsors’ internal resources. The construction works were undertaken by the Brazilian company Odebrecht. Construction works started in August 2007, and operations commenced in August 2011.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Water Supply and Storage, Hydro, Power Generation (CCGT), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project