logo

Darden Towe Park Paved Walking Trail

Sector: Car parking • Location: Charlottesville, Virginia, United States of America

Source: Dodge USA

Project
Closed

to install a paved walking trail at Darden Towe Park. Excavate walkway-1,200 ft long by 10ft wide, load and haul dirt to designated area on site, haul in and place 4" #21A stone, seed and straw as needed. (Does not include any pipe for drainage. Pipe to be provided by County/City) C. Paving-1,200 ft by 8 ft wide - Paving with SM 9.5A asphalt 2.5 inches compacted to 2 inches. D. Note- asphalt to be

Status
Closed
Sector
Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial, Waste Processing and Treatment
Location
Charlottesville, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Darden Towe Park Paved Walking Trail

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Darden Towe Park Paved Walking Trail” is an infrastructure initiative in the Car parking sector, located in Charlottesville, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

to install a paved walking trail at Darden Towe Park. Excavate walkway-1,200 ft long by 10ft wide, load and haul dirt to designated area on site, haul in and place 4" #21A stone, seed and straw as needed. (Does not include any pipe for drainage. Pipe to be provided by County/City) C. Paving-1,200 ft by 8 ft wide - Paving with SM 9.5A asphalt 2.5 inches compacted to 2 inches. D. Note- asphalt to be level to grass surface.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Charlottesville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial, Waste Processing and Treatment

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project