logo
ProjectCancelled

Darnitsa

One of 7,229 projects Taiyo tracks in Ukraine.

Source: European Bank for Reconstruction and Development (EBRD)

The proposed project is designed to support Darnitsa in financing of the modernisation and expansion of the existing manufacturing facilities as well as adding new product lines. The transition impact and demonstration effects associated with this potential investment are expected to include: Darnitsa is one of the leading pharmaceutical producers in Ukraine. The Bank will provide a loan to Darnit

Status
Closed
Sector
Waste Processing and Treatment, Manufacturing (Industrial), Residential
Location
Ukraine
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Darnitsa

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Darnitsa” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is designed to support Darnitsa in financing of the modernisation and expansion of the existing manufacturing facilities as well as adding new product lines. The transition impact and demonstration effects associated with this potential investment are expected to include: Darnitsa is one of the leading pharmaceutical producers in Ukraine. The Bank will provide a loan to Darnitsa of EUR 25 million. EUR 44.4 million. Environmental classification and rationale The project is Categorised B. Operation of the pharmaceutical production is associated with a number of site specific issues, which can be readily identified, assessed and mitigated through measures as defined in the Environmental and Social Action Plan. Due diligence completed Environmental and social due diligence (ESDD) has been undertaken by the Bank’s Environment and Sustainability Department based on the review of all available information, including site visit, review of corporate management systems and interviews with the Company’s representatives. Key environmental issues and mitigation The Company’s operations carry a low degree of environmental and social risk. Due diligence identified a need to document management systems procedures at the Corporate level and additionally identified a number of waste management, contractor management and emergency response issues which require to be addressed in order that the Company can operate to the standards of the Performance Requirements (PRs). These issues require mitigation actions to address not only operational risk but also the risks posed by the construction and fitting-out activities which are part of the Project going forward. Summary of Environmental Action Plan An Environmental and Social Action Plan (ESAP) has been developed and agreed with the Company to address some areas for improvement identified during the ESDD and carry out the necessary mitigation measures which will enable the Company to comply with national regulations and the Bank’s PRs. Since the beginning of the ESDD, the Company has already started implementation of some ESAP requirements and has already improved its EHS management system. Disclosure of information and consultation The Company will also disclose locally information on its environmental and social performance. Monitoring and reporting The Company will monitor the environmental impact of its operations in accordance with national law and regulations. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports prepared for the project covering: (i) ongoing performance of project-specific environmental, health and safety activities as reflected in the results of periodic and quantitative sampling and measuring programmes, and (ii) the status of implementation of environmental mitigation and improvement measures. The Bank’s representatives will also conduct periodic site supervision visits when deemed appropriate. None. Mikhail Chupryna Head of Corporate Finance Tel. +38 044 207 73 48 E-mail: mc@darnitsa.kiev.ua

Original sector

Manufacturing and Services

Location

Country

Ukraine

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Manufacturing (Industrial), Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project