DART+ Charging Infrastructure Project
Sector: Energy Storage • Location: Dublin, Ireland
Source: RailTech
Alstom has secured a contract from Irish Rail to provide fast-charging infrastructure for Battery Electric Multiple Unit (BEMU) trains in Dublin and Drogheda. The technology will be installed in 2024 as part of a deal valued at 28 million euros, ahead of the launch of new battery-electric DART+ trains that will enter service in 2025.
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT), Rail
- Location
- Dublin, Ireland
- Updated
- 22 Jul 2026
- Source
- RailTech
ConstructChat
Ask ConstructChat about DART+ Charging Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Closed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Alstom has secured a contract from Irish Rail to provide fast-charging infrastructure for Battery Electric Multiple Unit (BEMU) trains in Dublin and Drogheda. The technology will be installed in 2024 as part of a deal valued at 28 million euros, ahead of the launch of new battery-electric DART+ trains that will enter service in 2025. |
Budget |
Location
Country | Ireland |
City | Dublin |
Source
Source | RailTech |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Rail |
Article published date | 2024-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
