DART TRE Beltline Grade Separation

Sector: Automotive • Location: Irving, Texas, United States

Source: McCarthy Building Companies

Project
Completed

McCarthy completed construction on the TRE Beltline Grade Separation project for the commuter rail transit system known as the Trinity Railway Express (TRE), which is operated on behalf of both DART and the Fort Worth Transportation Authority (the T). This project involved a two-phase conversion of an at-grade, single line rail into two elevated railroad lines for the TRE in the City of Irving. De

Project Information FAQ

Project Information

4 Q
The project “DART TRE Beltline Grade Separation” is an infrastructure initiative in the Automotive sector, located in Irving, Texas, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

McCarthy completed construction on the TRE Beltline Grade Separation project for the commuter rail transit system known as the Trinity Railway Express (TRE), which is operated on behalf of both DART and the Fort Worth Transportation Authority (the T). This project involved a two-phase conversion of an at-grade, single line rail into two elevated railroad lines for the TRE in the City of Irving. Designed to eliminate the at-grade traffic conflict between train and automobile traffic at three key intersections in Irving, the project consists of 122 spans totaling over 1-1/2 miles long. McCarthy’s scope included drilled shaft foundations, cast-in-place columns, pre-cast beam erection, ballast and track construction, and roadway reconstruction at five intersections. The two-phased, dual-track project required construction of one half of the project while rail traffic continued on the other half. Throughout the entire project, McCarthy worked immediately adjacent to active commuter rail traffic. McCarthy exceeded DART's DBE utilization goal and went two full years with no lost-time accidents. Because of this, DART recognized McCarthy with an Outstanding Safety Achievement Award at a Safety Appreciation luncheon. While under construction, this was the safest ongoing project in DART’s entire rail program.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data