Darwell Lagoon Commission Phase B
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
The scope of services to be provided to the Commission for the project include the construction and commissioning of a new package submersible lift station, installation of owner supplied Septage Receiving Station, directionally drilling wastewater pipeline from the Darwell Wastewater System to the Sturgeon River near Alberta Beach, and installation of an outfall structure at the Sturgeon River.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Sangudo, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Darwell Lagoon Commission Phase B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of services to be provided to the Commission for the project include the construction and commissioning of a new package submersible lift station, installation of owner supplied Septage Receiving Station, directionally drilling wastewater pipeline from the Darwell Wastewater System to the Sturgeon River near Alberta Beach, and installation of an outfall structure at the Sturgeon River. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Sangudo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
