Dashields Locks & Dam Upper Guide Wall Stabilization REBID
Sector: Water Supply and Storage • Location: Moon Township, Pennsylvania, United States of America
Source: Dodge
construction of two stone buttresses on each side of the Upper Guide Wall (UGW) along the Ohio River to provide additional passive resistance to the guide wall and adjacent sheet pile wall at Dashields Locks and Dam, Allegheny County, PA. The work is to be performed from the riverward side of the existing UGW from a floating plant. The contract generally includes performing test borings at the loc
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | construction of two stone buttresses on each side of the Upper Guide Wall (UGW) along the Ohio River to provide additional passive resistance to the guide wall and adjacent sheet pile wall at Dashields Locks and Dam, Allegheny County, PA. The work is to be performed from the riverward side of the existing UGW from a floating plant. The contract generally includes performing test borings at the locations and points in time as outlined in the contract drawings and specifications, construction o... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
