Data Centers Communications Firm Data Center
Sector: Commercial • Location: United States of America (USA)
Source: Walsh
This data center expansion delivered 140,000-square-foot expansion of an existing data center, bringing its overall whitespace capacity to 50,000 square feet. Building mechanical and electrical infrastructure systems were designed to be redundant and expandable to meet future growth, including dual primary power feeds, three 3.2-MW standby generators, underground fuel storage with redundant delive
- Status
- Closed
- Sector
- Commercial, Data Center, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Power Transmission
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Walsh
ConstructChat
Ask ConstructChat about Data Centers Communications Firm Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This data center expansion delivered 140,000-square-foot expansion of an existing data center, bringing its overall whitespace capacity to 50,000 square feet. Building mechanical and electrical infrastructure systems were designed to be redundant and expandable to meet future growth, including dual primary power feeds, three 3.2-MW standby generators, underground fuel storage with redundant delivery systems and a UPS battery backup. Cooling systems are chilled water-based with first-phase scope including three 800-ton chiller lineups and innovative heat recovery chiller systems. A building automation system was designed with an open-protocol distribution control and integration system utilizing a dedicated local network system. The project achieved LEED NC Gold certification, as well as an Uptime Institute Tier II rating for a Concurrently Maintainable Site Infrastructure. The project achieved LEED NC Gold certification, as well as an Uptime Institute Tier II rating for a Concurrently Maintainable Site Infrastructure. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Walsh |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Power Transmission |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
