logo

Data Centre and Clean Power Infrastructure

Sector: Power Generation (CCGT) • Location: United States

Source: Energy Connects

Project
Planned

An executive order issued by President Joe Biden aims to expedite the permitting and buildout of data centre and clean power infrastructure on federal land, identifying sites for development by February 28, 2025.

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Location
United States of America
Updated
22 Jul 2026
Source
Energy Connects

ConstructChat

Ask ConstructChat about Data Centre and Clean Power Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Data Centre and Clean Power Infrastructure” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from Energy Connects.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An executive order issued by President Joe Biden aims to expedite the permitting and buildout of data centre and clean power infrastructure on federal land, identifying sites for development by February 28, 2025.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

Energy Connects

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project