Datong Lake District Urban and Rural Sewage treatment plant
One of 10,000+ projects Taiyo tracks in China.
Source: World Bank Group
he construction content of the integrated PPP project of urban and rural sewage treatment in Datong Lake District includes the construction of 7 new sewage treatment stations, the upgrading and upgrading of 4 sewage treatment plants to Class A, and the construction of supporting pipeline network of 235.611km. The total investment of the project is RMB 365,585,500 or $ 55.65 million. The scope of p
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Datong Lake District Urban and Rural Sewage treatment plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he construction content of the integrated PPP project of urban and rural sewage treatment in Datong Lake District includes the construction of 7 new sewage treatment stations, the upgrading and upgrading of 4 sewage treatment plants to Class A, and the construction of supporting pipeline network of 235.611km. The total investment of the project is RMB 365,585,500 or $ 55.65 million. The scope of project cooperation includes the construction, operation and maintenance of the new sewage treatment plant (station) and the pipeline network of the project. It also includes the operation and maintenance of the two sewage treatment plants and the stock pipeline network that have been upgraded and reconstructed. 13.389 million m³/d. The cooperation period of the project is 30 years, of which, the construction period is 2 years and the operation period is 28 years. Financial close took place on September 28, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/8d333dcbe37c4067ae510382b118447e |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant