logo
ProjectProject Awarded

Davenport Diamond rail grade separation PPP project

The owner, status and timeline of this project. A free account opens every field.

Source: InfraPPPWorld

The Davenport Diamond is one of the last high-traffic rail crossings in Toronto. To enhance safety and reliability, and to allow the significant expansion and enhancement of rail service promised by Metrolinx, the Davenport Diamond level crossing will be removed by constructing an overpass to separate the freight corridor from the GO corridor. GO Transit is a regional public transit system in Sout

Status
Closed
Sector
Bridge, Road, Rail, Mass Transit, Tunnel, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Davenport Diamond rail grade separation PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Davenport Diamond rail grade separation PPP project” is an infrastructure initiative in the Bridge sector, located in Ontario, Canada. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Company

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Davenport Diamond is one of the last high-traffic rail crossings in Toronto. To enhance safety and reliability, and to allow the significant expansion and enhancement of rail service promised by Metrolinx, the Davenport Diamond level crossing will be removed by constructing an overpass to separate the freight corridor from the GO corridor. GO Transit is a regional public transit system in Southern Ontario.The work required includes:construction of a grade separation structure between the north/south GO Rail corridor and east/west CP Rail corridor to minimize delays to GO serviceimplementation of a pedestrian underpass to restore east/west connection at Paton Roaderection of retaining walls forming the approaches of the grade separation structure, topped with noise barrier walls and superimposed cladding to minimize impacts on the communityconstruction of a rail guideway offset within the corridor during construction to accommodate a temporary diversion track and a temporary rail diamondmodification of an existing at-grade road crossing at Wallace Avenue to become a road under rail grade separationpublic realm enhancements, including artwork on the structure cladding and new pedestrian and cyclist routesprovisions for future electrification implemented within upgraded rail infrastructure to accommodate future electrified GO train service

Original sector

Transport

Procurement method

Budget

Location

Country

Canada

State

Ontario

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Bridge, Road, Rail, Mass Transit, Tunnel, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project