Davenport Diamond rail grade separation PPP project
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The Davenport Diamond is one of the last high-traffic rail crossings in Toronto. To enhance safety and reliability, and to allow the significant expansion and enhancement of rail service promised by Metrolinx, the Davenport Diamond level crossing will be removed by constructing an overpass to separate the freight corridor from the GO corridor. GO Transit is a regional public transit system in Sout
- Status
- Closed
- Sector
- Bridge, Road, Rail, Mass Transit, Tunnel, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Davenport Diamond rail grade separation PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Davenport Diamond is one of the last high-traffic rail crossings in Toronto. To enhance safety and reliability, and to allow the significant expansion and enhancement of rail service promised by Metrolinx, the Davenport Diamond level crossing will be removed by constructing an overpass to separate the freight corridor from the GO corridor. GO Transit is a regional public transit system in Southern Ontario.The work required includes:construction of a grade separation structure between the north/south GO Rail corridor and east/west CP Rail corridor to minimize delays to GO serviceimplementation of a pedestrian underpass to restore east/west connection at Paton Roaderection of retaining walls forming the approaches of the grade separation structure, topped with noise barrier walls and superimposed cladding to minimize impacts on the communityconstruction of a rail guideway offset within the corridor during construction to accommodate a temporary diversion track and a temporary rail diamondmodification of an existing at-grade road crossing at Wallace Avenue to become a road under rail grade separationpublic realm enhancements, including artwork on the structure cladding and new pedestrian and cyclist routesprovisions for future electrification implemented within upgraded rail infrastructure to accommodate future electrified GO train service |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Rail, Mass Transit, Tunnel, Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
