David Avenue MUP Realignment
Sector: Road • Location: Coquitlam, British Columbia, Canada
Source: Dodge USA
The City requires qualified, experienced companies to provide labour, equipment, materials, fuel, transportation, overhead and all that is required for the David Avenue MUP Realignment (the Work ). The Work includes the realignment of approx. 125 Square metres of asphalt multi-use pathway, installation of growing medium tree trench and street trees as described on the RFQ drawings prepared by ISL
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Coquitlam, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about David Avenue MUP Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City requires qualified, experienced companies to provide labour, equipment, materials, fuel, transportation, overhead and all that is required for the David Avenue MUP Realignment (the Work ). The Work includes the realignment of approx. 125 Square metres of asphalt multi-use pathway, installation of growing medium tree trench and street trees as described on the RFQ drawings prepared by ISL Engineering Ltd. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Coquitlam |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
