Dawson City’s Wastewater Treatment Project, Yukon, Canada

Sector: Biomass • Location: Thailand

Source: Water Technology

Project
Closed

An initiative of the Yukon government, the plant was designed and constructed by Corix Water Systems. The city was under a court order to build a secondary treatment facility by the end of 2011. Start-up testing of the boiler was undertaken in August 2012 and the plant commenced operations following completion of the tests. Dawson wastewater treatment project is Dawson City’s second treatment fac

Project Information FAQ

Project Information

3 Q
The project “Dawson City’s Wastewater Treatment Project, Yukon, Canada” is an infrastructure initiative in the Biomass sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

An initiative of the Yukon government, the plant was designed and constructed by Corix Water Systems. The city was under a court order to build a secondary treatment facility by the end of 2011. Start-up testing of the boiler was undertaken in August 2012 and the plant commenced operations following completion of the tests. Dawson wastewater treatment project is Dawson City’s second treatment facility. The city was under a court order to build a secondary treatment facility by the end of 2011. The plant commenced operations in August 2012. An initiative of the Yukon government, the plant was designed and constructed by Corix Water Systems at an estimated cost of C$34.3m. On 7 July 2009, the project broke ground when Dawson City partnered with the Yukon government by signing a Memorandum of Understanding to build the project. A test hole was drilled at the project site between 10 and 14 August 2009 to determine the geological and hydro-geological aspects of the ground. After drilling, foundations were laid and the exterior of the building was constructed in spring 2010. In September 2010, a 16m x 12m lined pond was constructed in order to facilitate re-circulation of water required for drilling. Both the main treatment shafts were drilled and the associated components were installed in November 2010. Excavation for the new sewage sump, next to the screening plant, began in May 2011. Preparation for the concrete building foundation was also started during the same month. Dawson’s Fifth Avenue manhole was replaced in June 2011. Concrete pours started in early June 2011 after the completion of a de-watering programme which started in May 2011. Concrete pouring works were all completed by April 2012. Start-up testing of the boiler was undertaken in August 2012 and the plant commenced operations following completion of the tests. Corix Water Systems will undertake one year testing of the plant, during which it will provide training to the staff of Dawson public works to enable a smooth transition. The Dawson facility uses an aerobic activated sludge process called Vertreat (vertical treatment), which consists of two 1.4m diameter shafts installed 100m deep in the ground. Two steel cylinders for collecting sludge are grouted to the ground. Air is supplied through 150hp air compressors. The plant also consists of a hold tank, head tank, dissolved air floatation clarifier and effluent biofilters. The reactor consists of three separate treatment zones. The oxidation zone occupying the upper part of the reactor includes a central concentric draft tube for mixed liquor circulation. Immediately below is the mixing zone. The bottom of the reactor acts as the saturation zone. The reactor is installed at a depth of 75m-110m using conventional drilling or excavation techniques. Compared with traditional wastewater treatment plants, the Vertreat technology saves 50% more energy, is compact, robust and requires low maintenance. Betty Lake Water Treatment Plant at CFB Wainwright was upgraded with a filtration system and an immersed membrane system in 2009. A degritted and screened influent stream is mixed with return activated sludge in the hold tank, in this process. An airlift effect caused by the injection of air into the mixing zone draws the influent from the hold tank into the bioreactors. It remains in contact with air and biomass for several minutes before it reaches the head tank. Due to high reaction rates, a large portion of organic compounds are bio-oxidised in the oxidation zone. The recirculating liquid travels up the riser and flows into the head tank, where entrained used gas bubbles release into the atmosphere. To remove any volatile organic compounds the vent stream is treated in biofilters. A relatively lesser amount of mixed liquid flows from the mixed zone to the saturation zone. Characterised by high dissolved concentration and longer resistance time, this zone creates a high degree of residual biochemical oxygen demand (BOD) oxidation. The high dissolved gas concentration also leads to solid separation in the floatation clarifier. To ensure the bottom of the reactor does not accumulate grit or solids, the treated effluent travels from the bioreactor to dissolved air flotation clarifiers. Rapid depressurisation separates biomass from the effluent and also results in well-aerated floc of low density. At the bottom of the clarifiers, biomass thickens to nearly four percent solids. Treated and high quality effluent flows to the nitrification biofilters. Part of the sludge is recycled back to the hold tank and waste sludge pumps by gravity. Equipped with centrifugal air blowers, the nitrification biofilters nitrify the effluent. Containing acclimatised biomass on porous media, it also reduces residual TSS and BOD to extremely low levels by polishing any organic material that takes more time to biodegrade. After filtration, the effluent flows to a backwash tank where it is directed either to the filter as backwash water or discharged to the battery limit. Using an intermittent backwash pump, the biofilters are periodically backwashed. The spent backwash is recycled to the hold tank. Sub contractors to the project include Allnorth Consultants, Keith Plumbing and Heating, EBA Consulting, StreamLine Architects, Construction Drilling, Ben’s Electric and Dorward Engineering. Vertreat technology to the plant was provided by Noram Engineering. Tybrook Erectors provided cranes for the erection of steel trusses. The snow clearing on the site is provided by Happy Marmot Landscaping crew, with the assistance of Gammie Trucking’s loader. An AECOM team acted as the owner’s representative on behalf of the Yukon government to supervise the plant’s design, construction and commissioning. The City of Calgary officially unveiled its advanced Pine Creek Wastewater Treatment Plant (WWTP) in May 2010. With a daily capacity of 1.8 billion litres, the new Seymour-Capilano water filtration plant in Metro, Vancouver became operational in May 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data