logo

Dawson Creek - 102nd Avenue Crossing Replacement Project

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of the replacement of the 102nd Avenue creek crossing located within the City of Dawson Creek boundaries. It is proposed to replace the existing undersized culverts, which are prone to flooding, with a clear span bridge. The design includes a span bridge across the creek with two lanes and a pedestrian sidewalk on the south side. The channel will be modified by approx. 150m u

Status
Closed
Sector
Water Supply and Storage, Road, Bridge, Car parking, Government, Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Dawson Creek - 102nd Avenue Crossing Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dawson Creek - 102nd Avenue Crossing Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the replacement of the 102nd Avenue creek crossing located within the City of Dawson Creek boundaries. It is proposed to replace the existing undersized culverts, which are prone to flooding, with a clear span bridge. The design includes a span bridge across the creek with two lanes and a pedestrian sidewalk on the south side. The channel will be modified by approx. 150m upstream and/or downstream of the crossing. Instream work includes lowering the channel bed, widening the watercourse, and flattening the slopes. Riprap will be placed on the banks to prevent scour and erosion. The design drawings for the new creek crossing show the site extents and the proposed bridge. The new 102nd Avenue bridge spans 26 meters and will accommodate two (2) 6 meter traffic lanes with a protected pedestrian sidewalk on both sides of the bridge that will satisfy current design loading, geometric and safety standards. The existing water and storm mains that cross the creek at this location will be replaced to accommodate the newly widened creek cross section. Catchbasins will also be added to on each side of the bridge to divert stormwater from the road surface to storm outfalls near the creek. The new water line crossing will be directionally drilled underneath the river to minimize the work in the creek bed and for ease of installation. The project also includes channel modification, erosion protection, and re-vegetation upstream and downstream of the crossing. The erosion protection consists of 50 kilogram rip-rap on the banks of the creek from the bed to the high water elevation. Planting includes live stakes, planted trees, shrubs and seeding to stabilize disturbed areas.

Original sector

Climate Resilience

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Bridge, Car parking, Government, Automotive

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project