logo

Dawson Creek - 102nd Avenue Crossing Replacement Project

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of the replacement of the 102nd Avenue creek crossing located within the City of Dawson Creek boundaries. It is proposed to replace the existing undersized culverts, which are prone to flooding, with a clear span bridge. The design includes a span bridge across the creek with two lanes and a pedestrian sidewalk on the south side. The channel will be modified by approx. 150m u

Project Information FAQ

Project Information

4 Q
The project “Dawson Creek - 102nd Avenue Crossing Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the replacement of the 102nd Avenue creek crossing located within the City of Dawson Creek boundaries. It is proposed to replace the existing undersized culverts, which are prone to flooding, with a clear span bridge. The design includes a span bridge across the creek with two lanes and a pedestrian sidewalk on the south side. The channel will be modified by approx. 150m upstream and/or downstream of the crossing. Instream work includes lowering the channel bed, widening the watercourse, and flattening the slopes. Riprap will be placed on the banks to prevent scour and erosion. The design drawings for the new creek crossing show the site extents and the proposed bridge. The new 102nd Avenue bridge spans 26 meters and will accommodate two (2) 6 meter traffic lanes with a protected pedestrian sidewalk on both sides of the bridge that will satisfy current design loading, geometric and safety standards. The existing water and storm mains that cross the creek at this location will be replaced to accommodate the newly widened creek cross section. Catchbasins will also be added to on each side of the bridge to divert stormwater from the road surface to storm outfalls near the creek. The new water line crossing will be directionally drilled underneath the river to minimize the work in the creek bed and for ease of installation. The project also includes channel modification, erosion protection, and re-vegetation upstream and downstream of the crossing. The erosion protection consists of 50 kilogram rip-rap on the banks of the creek from the bed to the high water elevation. Planting includes live stakes, planted trees, shrubs and seeding to stabilize disturbed areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data