DC Regional Water Interconnection Phase 1 & 2
Sector: Car parking • Location: Ridgeville, South Carolina, United States of America
Source: Dodge USA
This project consist of two phases. Phase One is the construction of approximately 6 miles of 20 inch PVC water line starting at the RCP tank on Hwy-27 and terminating along Hwy-27, south of the Town of Ridgeville. Phase Two will be approximately 7 miles of 20 inch PVC from the Bridlewood Water System to the Pine Hill Commerce Park. Project design engineer is Michael Baker for Phase 1 and 2.
- Status
- Prospective
- Sector
- Car parking, Water Supply and Storage, Road, Automotive, Government, Commercial, Waste Processing and Treatment
- Location
- Ridgeville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DC Regional Water Interconnection Phase 1 & 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consist of two phases. Phase One is the construction of approximately 6 miles of 20 inch PVC water line starting at the RCP tank on Hwy-27 and terminating along Hwy-27, south of the Town of Ridgeville. Phase Two will be approximately 7 miles of 20 inch PVC from the Bridlewood Water System to the Pine Hill Commerce Park. Project design engineer is Michael Baker for Phase 1 and 2. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Ridgeville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Road, Automotive, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
