DC/DOT: Sign Structure Upgrade & Replacement
Sector: Road • Location: Washington, District of Columbia, United States of America
Source: Dodge
SIGN STRUCTURE UPGRADE AND REPLACEMENT :::: PROJECT DESCRIPTION: THE PURPOSE OF THIS PROJECT IS TO DESIGN AND UPGRADE MAJOR SIGNS STRUCTURES WITHIN THE DISTRICT AS WELL AS PRIORITIZE CORRIDOR LEVEL FUTURE DESIGN PROJECTS. THE PROJECT ALSO INCLUDES A REVIEW EXISTING CONDITION ASSESSMENT, STRUCTURAL EVALUATION, DETAILED INSPECTION, AS NEEDED AND COORDINATION ON FUTURE ASSET MANAGEMENT NEEDS. The Dis
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | SIGN STRUCTURE UPGRADE AND REPLACEMENT :::: PROJECT DESCRIPTION: THE PURPOSE OF THIS PROJECT IS TO DESIGN AND UPGRADE MAJOR SIGNS STRUCTURES WITHIN THE DISTRICT AS WELL AS PRIORITIZE CORRIDOR LEVEL FUTURE DESIGN PROJECTS. THE PROJECT ALSO INCLUDES A REVIEW EXISTING CONDITION ASSESSMENT, STRUCTURAL EVALUATION, DETAILED INSPECTION, AS NEEDED AND COORDINATION ON FUTURE ASSET MANAGEMENT NEEDS. The District of Columbia, may be seeking a consultant to provide DESIGN AND UPGRADE MAJOR SIGNS STRUCTUR... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
