DCHZI Anaerobic Digester Facility
The owner, status and timeline of this project. A free account opens every field.
Source: Waste Dive
The DCHZI Anaerobic Digester Facility is a food waste anaerobic digestion plant located in Louisville Township, Minnesota. It is designed to process up to 75,000 tons of food waste annually from the Twin Cities area and produce 7,000 tons of biochar annually. The project is a collaboration between Dem-Con and Kanadevia Inova, with financial backing from the Minnesota Environment and Natural Resour
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Natural Gas, Biomass
- Location
- Louisville Township, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Waste Dive
ConstructChat
Ask ConstructChat about DCHZI Anaerobic Digester Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The DCHZI Anaerobic Digester Facility is a food waste anaerobic digestion plant located in Louisville Township, Minnesota. It is designed to process up to 75,000 tons of food waste annually from the Twin Cities area and produce 7,000 tons of biochar annually. The project is a collaboration between Dem-Con and Kanadevia Inova, with financial backing from the Minnesota Environment and Natural Resources Trust Fund and the Minnesota Department of Commerce. The facility aims to support Minnesota's organic waste recycling and clean energy goals, including producing renewable natural gas with offtake agreements from utilities CenterPoint Energy and Xcel Energy. |
Original sector | Waste Management |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Louisville Township |
Source
Source | Waste Dive |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Natural Gas, Biomass |
Article published date | 2026-04-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
