DCM Facility Improvements Phase 1
Sector: Road • Location: Fall River, Massachusetts, United States of America
Source: Dodge USA
DCM Facility Improvements Project PHASE 1 The work consists of the removal and disposal of the existing salt shed, attendant booth, truck scale, and scale house, the installation of new sewer, water, and drainage systems, and the construction of a new truck scale, modular attendant booths, gravity block retaining walls, landscaping and site paving. Bids shall be on a lump sum and unit price basis.
- Status
- Closed
- Sector
- Road, Government, Commercial, Residential, Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage
- Location
- Fall River, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DCM Facility Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DCM Facility Improvements Project PHASE 1 The work consists of the removal and disposal of the existing salt shed, attendant booth, truck scale, and scale house, the installation of new sewer, water, and drainage systems, and the construction of a new truck scale, modular attendant booths, gravity block retaining walls, landscaping and site paving. Bids shall be on a lump sum and unit price basis. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Fall River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Residential, Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
