logo

DCM Facility Improvements Phase 1

Sector: Water Supply and Storage • Location: Fall River, Massachusetts, United States of America

Source: Dodge

Project
Bidding

DCM Facility Improvements Project PHASE 1 The work consists of the removal and disposal of the existing salt shed, attendant booth, truck scale, and scale house, the installation of new sewer, water, and drainage systems, and the construction of a new truck scale, modular attendant booths, gravity block retaining walls, landscaping and site paving. Bids shall be on a lump sum and unit price basis.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Residential, Road
Location
Fall River, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about DCM Facility Improvements Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “DCM Facility Improvements Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Fall River, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

DCM Facility Improvements Project PHASE 1 The work consists of the removal and disposal of the existing salt shed, attendant booth, truck scale, and scale house, the installation of new sewer, water, and drainage systems, and the construction of a new truck scale, modular attendant booths, gravity block retaining walls, landscaping and site paving. Bids shall be on a lump sum and unit price basis.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Fall River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Residential, Road

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project