logo
ProjectActive

DCM Fibra E CFE

Active · Mexico

Source: International Finance Corporation (IFC)

 The proposed investment consists of an IFC anchor investment of up to US$150 million in a bond issuance of US$725 million by Fideicomiso Irrevocable Numero 188156 (“CFE Fibra E Trust” or “CFE Fibra E” or “Issuer”), an investment vehicle managed by CFECAPITAL, S. De R.L. De C.V. (“CFE Capital”), an affiliate of state-owned utility company Comisión Federal de Electricidad (“CFE”). This vehicle was

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Government
Location
Mexico
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about DCM Fibra E CFE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “DCM Fibra E CFE” is an infrastructure initiative in the Power Transmission sector, located in Mexico. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment consists of an IFC anchor investment of up to US$150 million in a bond issuance of US$725 million by Fideicomiso Irrevocable Numero 188156 (“CFE Fibra E Trust” or “CFE Fibra E” or “Issuer”), an investment vehicle managed by CFECAPITAL, S. De R.L. De C.V. (“CFE Capital”), an affiliate of state-owned utility company Comisión Federal de Electricidad (“CFE”). This vehicle was established in 2018 to securitize 6.78% of the collection rights from the Fideicomiso Irrevocable de Administración y Fuente de Pago No. 80758 (Promoted Trust). The project is expected to have positive impact in mitigating the issues of the Mexican energy sector, and enabling the commissioning of further grid capacity. Under the project, IFC proceeds can only be used for capital expenditures (CAPEX) subprojects that meet the following eligibility criteria: a) can meet IFC Performance Standards (PS); b) pose limited environmental, social, health and safety (ESHS) risks; c) do not require new footprint; d) avoids impacts on biodiversity sensitive areas (e.g. Legally Protected Areas (LPA), Key Biodiversity Areas (KBA), Alliance for Zero Extinction (AZE) sites, UNESCO Natural and Mixed World Heritage Sites (WHS); UNESCO Man and Biosphere Reserves; and Ramsar sites); e) do not affect Indigenous Peoples; f) do not require land acquisition or displacement of population; and g) do not have associated facilities that fail to meet the above criteria. Ten subprojects have been preliminarily identified as eligible, out of which a subset will be selected for use of IFC proceeds. All subprojects involve the modernization and replacement of electrical infrastructure—such as transformer banks, capacitor banks, protection and control systems, and underground cables—within existing substations or underground transmission corridors. These activities are distributed across various regions of Mexico, including Baja California, Baja California Sur, Sonora, Sinaloa, Jalisco, Nuevo León, Coahuila, Tamaulipas, Puebla, and Chihuahua.

Original sector

V-DA - Electric Power Transmission

Location

Country

Mexico

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project