logo
ProjectPending

DCM PEPT ABS II

Pending · Cote D'Ivoire

Source: IFC Project Disclosures

  The proposed transaction consists of an investment of up to XOF15.8 billion (US$28.3 million eq.) in a new issuance of up to XOF60 billion (US$107.2 million eq.) asset-backed securities of FCTC EPT, a special purpose vehicle (the FCTC or SPV) and existing IFC client in Côte d’Ivoire (the Project). This would be IFC’s second investment in FCTC and would take the form of two Unfunded Ris

Status
Prospective
Sector
V-EA - Distribution Business
Location
Cote d'Ivoire
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about DCM PEPT ABS II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “DCM PEPT ABS II” is an infrastructure initiative in the V-EA - Distribution Business sector, located in Cote D'Ivoire. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

  The proposed transaction consists of an investment of up to XOF15.8 billion (US$28.3 million eq.) in a new issuance of up to XOF60 billion (US$107.2 million eq.) asset-backed securities of FCTC EPT, a special purpose vehicle (the FCTC or SPV) and existing IFC client in Côte d’Ivoire (the Project). This would be IFC’s second investment in FCTC and would take the form of two Unfunded Risk Participations (URPs). IFC will provide i) a 100% URP covering up to XOF7.7 billion (US$13.7 million eq.) to Société Ivoirienne de Banque (SIB) to support its participation in the 10-year Tranche B, and ii) an 80% URP covering up to XOF8.2 billion (US$14.6 million eq.) to the Emerging Africa and Asia Infrastructure Fund (EAAIF) to support its participation in the 15-year Tranche C.The Project will finance up to 606,702 connections (including 423,828 new) for low-income households, in addition to 405,000 financed under PEPT I (#46344). The SPV’s assets are receivables from low-income households originated and managed by Compagnie Ivoirienne d’Électricité, the national grid company corresponding to grid connection costs. As PEPT I, the issuance will be labeled a Social Bond,the second in the region.                                                 

Original sector

V-EA - Distribution Business

Location

Country

Cote d'Ivoire

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project