DCT's Terminal 3 Expansion Project (Project Leopard)
Disbursing · Poland
Source: European Bank for Reconstruction and Development (EBRD)
A senior loan of up to EUR 150 million in favour of DCT Gdansk (“DCT” or the “Company”) and its 100% holding Baltic Hub (“HoldCo”), both incorporated in Poland. EBRD loan will be part of a wider debt package of up to EUR 863.5 million provided jointly with commercial banks to i) refinance the Company's existing debt, ii) capex for construction of Terminal 3, and iii) provide working capital for th
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Rail, Seaport, Residential, Commercial, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about DCT's Terminal 3 Expansion Project (Project Leopard)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A senior loan of up to EUR 150 million in favour of DCT Gdansk (“DCT” or the “Company”) and its 100% holding Baltic Hub (“HoldCo”), both incorporated in Poland. EBRD loan will be part of a wider debt package of up to EUR 863.5 million provided jointly with commercial banks to i) refinance the Company's existing debt, ii) capex for construction of Terminal 3, and iii) provide working capital for the Company. EBRD’s loan will be focused on capex facility and will contribute to funding construction of Terminal 3, upgrade and renewal of the equipment on Terminals 1 and 2 and additional yard development. In English and Polish 1. National EIA 2. Critical Habitat Assessment 3. Ornithology Mitigation Review 4. Marine Mammal Mitigation Review 5. Assessment of impacts on marine environment related to capital dredging 6. Stogi beach morphology and water quality 7. Social Baseline and Assessment 8. Stakeholder Engagement Plan 9. Environmental and Social Action Plan 10.Non-Technical Summary Download English package in zip format Download Polish package in zip format Full ESIA documentation is available locally at: T3 Development Unit DCT Gdansk SA, 7 Kontenerowa Street, 80-601 Gdansk, Poland and Documentation T3 - Terminal Kontenerowy DCT (dctgdansk.pl) Dokumentacja T3 - Terminal Kontenerowy DCT (dctgdansk.pl) F Environmental or social enquiries DCT Gdansk Sp. z o.o. ul. Kontenerowa 7 80-601 Gdańsk, Poland T3-development@dctgdansk.com |
Original sector | Transport |
Budget |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Rail, Seaport, Residential, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
