logo

DDJC Tracy Warehouse 16-B Column Repairs

Sector: Warehouse • Location: Tracy, California, United States of America

Source: Dodge

Project
Closed

Scope - The Contractor shall provide all labor, material, and equipment necessary to effect column repairs in Warehouse 16-B. In total, fourteen (14) columns will be repaired consisting of three (3) corbel style repairs and eleven (11) column style repairs. The contractor shall also be required to disconnect and modify electrical wiring and conduit that is mounted on the existing column faces to a

Status
Closed
Sector
Warehouse, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
Location
Tracy, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about DDJC Tracy Warehouse 16-B Column Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “DDJC Tracy Warehouse 16-B Column Repairs” is an infrastructure initiative in the Warehouse sector, located in Tracy, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - The Contractor shall provide all labor, material, and equipment necessary to effect column repairs in Warehouse 16-B. In total, fourteen (14) columns will be repaired consisting of three (3) corbel style repairs and eleven (11) column style repairs. The contractor shall also be required to disconnect and modify electrical wiring and conduit that is mounted on the existing column faces to accommodate the installation of the proposed repair. Any required modification to electrical wirin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Tracy

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Warehouse, Power Generation (CCGT), Commercial, Manufacturing (Industrial)

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project