DDM : Belle Isle Sp - Wayfinding Improvements
Closed · Michigan · Last reported Oct 2024
Source: Dodge USA
Installation of 106 wayfinding sign structures including posts, concrete foundations, and removals of existing wayfinding signs where indicated on the plans according to the details and specifications on the plans. Work shall be split into two distinct phases. Phase 1 work consisting of 56 sign structures shall be considered the base bid. Phase 2 work shall be considered bid Alternate 1 consisting
- Status
- Closed
- Sector
- Commercial, Road, Cement, Rail, Mass Transit
- Location
- Detroit, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DDM : Belle Isle Sp - Wayfinding Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of 106 wayfinding sign structures including posts, concrete foundations, and removals of existing wayfinding signs where indicated on the plans according to the details and specifications on the plans. Work shall be split into two distinct phases. Phase 1 work consisting of 56 sign structures shall be considered the base bid. Phase 2 work shall be considered bid Alternate 1 consisting of 40 sign structures. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Detroit |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Cement, Rail, Mass Transit |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
