De Palma Road Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: Santiago Canyon Road to Horsethief Canyon Road Length: Approximately 1.4 miles District: 1 Community: Horsethief Canyon
The County of Riverside Transportation Department is proposing to resurface approximately 1.4 miles of De Palma Road from Santiago Canyon Road to Horsethief Canyon Road. De Palma Road is classified as a Major Highway in the County of Riverside General Plan. De Palma Road
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: Santiago Canyon Road to Horsethief Canyon Road Length: Approximately 1.4 miles District: 1 Community: Horsethief Canyon The County of Riverside Transportation Department is proposing to resurface approximately 1.4 miles of De Palma Road from Santiago Canyon Road to Horsethief Canyon Road. De Palma Road is classified as a Major Highway in the County of Riverside General Plan. De Palma Road is a two lane road and currently ranges from 29-80 feet wide with dike at various segments of the roadway. The proposed improvements consist of pulverizing the roadway width and dirt shoulder, then overlaying the pulverized material with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of asphalt concrete dike and overside drain Replacement of guardrail Placement of safety edge, shoulder backing, miscellaneous asphalt concrete, railings, and barricades. Utility adjustments Striping of roadway, including pavement markers and reflectors Remove/Salvage and replacement of signs No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. The project improvements will raise existing roadway profile by 0.45 feet. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
