logo
ProjectNotice Of Completion

Dean Avenue Meter Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Replace the existing water meter in the underground vault at Dean and Buffalo Grass Drive . The current meter is 12 in diameter, 19 in length. The new meter is a 10 OMNI Turbo (T2) supplied by the City, 42 in length. A new 12 gate valve is to be installed downstream of the existing vault. This will have to be done prior to any other work to ensure water service during the rest of construction. Rem

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Raymore, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Dean Avenue Meter Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dean Avenue Meter Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Raymore, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Notice of Completion

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the existing water meter in the underground vault at Dean and Buffalo Grass Drive . The current meter is 12 in diameter, 19 in length. The new meter is a 10 OMNI Turbo (T2) supplied by the City, 42 in length. A new 12 gate valve is to be installed downstream of the existing vault. This will have to be done prior to any other work to ensure water service during the rest of construction. Remove the existing piping in the vault and replace as per the new configuration. All existing valve...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Raymore

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project