Deaver D52 Lateral Piping Replacement
Sector: Waste Processing and Treatment • Location: Deaver, Wyoming, United States of America
Source: Dodge
The Deaver D52 Lateral Piping Project consists of: 16,450 feet of 27 - 15 PIP or a combination of 28 16 HDPE and PIP pipe installed by open trench 128 feet of 28 fused HDPE pipe through an existing culvert Valves, miscellaneous fittings, and turnout services with meters Grading of existing canals
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive, Commercial, Government
- Location
- Deaver, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Deaver D52 Lateral Piping Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Deaver D52 Lateral Piping Project consists of: 16,450 feet of 27 - 15 PIP or a combination of 28 16 HDPE and PIP pipe installed by open trench 128 feet of 28 fused HDPE pipe through an existing culvert Valves, miscellaneous fittings, and turnout services with meters Grading of existing canals |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Deaver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
