logo

Decatur Sanitary Sewer Rehabilitation

One of 10,000+ projects Taiyo tracks in Tennessee.

Source: Dodge

Project
Closed

The project includes the replacement of Five Points Pump Station and associated site work, electrical/control, fencing, and other appurtenances and the rehabilitation of approximately 9,000 LF of 8 inch gravity sewer lines by CIPP, 800 LF of 8-inch gravity sewer by pipe bursting, 1,250 LF of 8-inch open-cut replacement, and 450 VF of manhole lining. Rehabilitation also includes miscellaneous repai

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
Location
Decatur, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Decatur Sanitary Sewer Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Decatur Sanitary Sewer Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Decatur, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the replacement of Five Points Pump Station and associated site work, electrical/control, fencing, and other appurtenances and the rehabilitation of approximately 9,000 LF of 8 inch gravity sewer lines by CIPP, 800 LF of 8-inch gravity sewer by pipe bursting, 1,250 LF of 8-inch open-cut replacement, and 450 VF of manhole lining. Rehabilitation also includes miscellaneous repairs such as frame and cover replacements, lateral repairs, and point repairs

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Decatur

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project