Decentralized Rural Development Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Decentralized Rural Development Project seeks to improve market access, and increase the agricultural output for rural communities in selected areas of Bhutan. To this end, the project components are as follows. Component 1 - rural access and economic infrastructure - will finance local public goods, i.e. farm roads, power tiller roads, irrigation channels, which have already been identified a
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Fertilizers, Power Generation (CCGT), Consumer Products, Commercial, Raw Materials, Government
- Location
- Bhutan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Decentralized Rural Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Decentralized Rural Development Project seeks to improve market access, and increase the agricultural output for rural communities in selected areas of Bhutan. To this end, the project components are as follows. Component 1 - rural access and economic infrastructure - will finance local public goods, i.e. farm roads, power tiller roads, irrigation channels, which have already been identified at the local level as priorities for rural communities, as part of the 9th Five Year Plan (FYP). The second component - renewable natural resource centers - will finance the construction for, and programming of the so-called Renewable Natural Resources (RNR) Centers, as the focal point of the Ministry of Agriculture, to help farmers take advantage of productivity, and income gains, through demonstration, knowledge sharing, and capacity building. Finally, the third component - institutional strengthening - will finance capacity-building at the local-level administration, for planning aspects, and for the physical reporting of project implementation performance, to ensure the appropriate transfer of funds to the local level. In addition, capacity building will also be supported for an adequate environmental, and social screening and assessment. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Bhutan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Fertilizers, Power Generation (CCGT), Consumer Products, Commercial, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Bhutan
- Central Asia-China Gas Pipeline, Turkmenistan to China
- Double-laning of NEWH from Dochula-Simtokha (Olakha)
- Double-laning of NEWH from Pinzhi-Tashipokto
- Double-laning of NEWH from Lamperi-Menchuna
- Double-laning of NEWH from Dochula-Lamperi
- Double-laning of NEWH from Pelela-Rukubji
- Double-laning of NEWH from Yotongla-Bongzam
- Double-laning of NEWH from Chuserbu-Nyalazam
