Decision Support System for the San Juan River Basin
Sector: Water Supply and Storage • Location: Mexico
Source: Inter-American Development Bank (IADB)
Objective 1: A shared understanding among all project participants of the conceptualization and need for an integrated basin observatory and a suite of relevant potential assessment metrics; agreement on the monitoring and modeling activities for the pilot project; identification of the observatory infrastructure that could be purchased and installed with additional funds; draft of decision-maker
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Decision Support System for the San Juan River Basin
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Objective 1: A shared understanding among all project participants of the conceptualization and need for an integrated basin observatory and a suite of relevant potential assessment metrics; agreement on the monitoring and modeling activities for the pilot project; identification of the observatory infrastructure that could be purchased and installed with additional funds; draft of decision-maker needs and interests (draft decision map); scoping of key strategic decisions to be supported in the pilot project. Objective 2: Informed identification of a specific and executable example for modeling; identification of the watershed model and water decision framework as well as of the parameters of the model to allow for (i) testing against available data, (ii) visualization of existing data and model output and their comparison, (iii) delineation of modeling weaknesses, (iv) identification of the need for improved monitoring in the watershed observatory to support modeling efforts. Objective 3: Present a tangible and useful example of an integrated approach to water planning; identify next steps for agencies (e.g., dissemination of knowledge among local groups; integration of knowledge and new data into existing processes; redesign of existing processes; increase capacity in the SJRB for integrated strategic water planning); provide evidence for the need for an integrated water planning process and its expansion within the SJRB and for basins in other LAC countries. |
Original sector | WATER AND SANITATION |
Budget |
Location
Country | Mexico |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Samalayuca II CCGT Plant Chihuahua Mexico
- Tuxtla Gutierrez Wastewater Treatment Plant - Phase I
- Lerdo Wastewater Treatment Plant
- Cancun Recycling & Waste Processing Plant
- SSA Car Terminal Lazaro Cardenas
- Veracruz and Medellin Water and Sewerage Services
- Tuxpan Container Terminal
