Declaration Energy Center 550MW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construction of a 550 megawatt solar energy facility within the former Seneca Army Depot in the Towns of Romulus and Varick, Seneca County, New York, encompassing an approximately 7,778-acre portion of the relict Depot site that was approved for transfer from the United States Army to the Seneca County Industrial Development Agency and ultimately sold to the current landowners.
- Status
- Prospective
- Sector
- Solar, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Willard, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Declaration Energy Center 550MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of a 550 megawatt solar energy facility within the former Seneca Army Depot in the Towns of Romulus and Varick, Seneca County, New York, encompassing an approximately 7,778-acre portion of the relict Depot site that was approved for transfer from the United States Army to the Seneca County Industrial Development Agency and ultimately sold to the current landowners. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Willard |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
