Decommission Beach Sewer in Manette (OF-4 to EB-2)
Sector: Bridge • Location: Bremerton, Washington, United States of America
Source: City of Bremerton
Many of the residences and commercial buildings along the water in Manette between E 16th Street and the Manette Bridge are connected to a sewer main buried under the beach. This sewer main is difficult to access and maintain and can surcharge during heavy rainstorms. To address this issue, the City will be installing an upland sewer system and abandoning the beach main and lateral connections.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Many of the residences and commercial buildings along the water in Manette between E 16th Street and the Manette Bridge are connected to a sewer main buried under the beach. This sewer main is difficult to access and maintain and can surcharge during heavy rainstorms. To address this issue, the City will be installing an upland sewer system and abandoning the beach main and lateral connections. The project will install an upland low pressure sewer system in the vicinity of E. 16th Street and Marlow Avenue off of Wheaton Way, which will allow for the abandonment of 1,800 feet of gravity beach sewer. The beach sewer was installed in 1972 and is located between E 16th Street and the base of the Manette Bridge. An estimated thirteen (13) apartment complexes and condominiums, as well as seven (7) single family residences currently discharge to the beach sewer. The flow from these properties will be routed to the proposed upland system using grinder pump systems. By making these improvements, the City hopes to improve the marine environment of the Port Washington narrows and reduce the need to disturb the beach environment for maintenance. Parametrix has been selected as the design consultant. Project Status (Updated March 24, 2023) The project is currently in design with anticipated completion in late 2023 for construction in 2024. The schedule for completion has been delayed as the City resolves issues associated with permitting and cultural resources. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
