logo

Decommission Beach Sewer in Manette (OF-4 to EB-2)

Sector: Bridge • Location: Bremerton, Washington, United States of America

Source: City of Bremerton

Project
Prospective

Many of the residences and commercial buildings along the water in Manette between E 16th Street and the Manette Bridge are connected to a sewer main buried under the beach. This sewer main is difficult to access and maintain and can surcharge during heavy rainstorms. To address this issue, the City will be installing an upland sewer system and abandoning the beach main and lateral connections.

Project Information FAQ

Project Information

4 Q
The project “Decommission Beach Sewer in Manette (OF-4 to EB-2)” is an infrastructure initiative in the Bridge sector, located in Bremerton, Washington, United States of America. Taiyo aggregates data on it from City of Bremerton.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Many of the residences and commercial buildings along the water in Manette between E 16th Street and the Manette Bridge are connected to a sewer main buried under the beach. This sewer main is difficult to access and maintain and can surcharge during heavy rainstorms. To address this issue, the City will be installing an upland sewer system and abandoning the beach main and lateral connections. The project will install an upland low pressure sewer system in the vicinity of E. 16th Street and Marlow Avenue off of Wheaton Way, which will allow for the abandonment of 1,800 feet of gravity beach sewer. The beach sewer was installed in 1972 and is located between E 16th Street and the base of the Manette Bridge. An estimated thirteen (13) apartment complexes and condominiums, as well as seven (7) single family residences currently discharge to the beach sewer. The flow from these properties will be routed to the proposed upland system using grinder pump systems. By making these improvements, the City hopes to improve the marine environment of the Port Washington narrows and reduce the need to disturb the beach environment for maintenance. Parametrix has been selected as the design consultant. Project Status (Updated March 24, 2023) The project is currently in design with anticipated completion in late 2023 for construction in 2024. The schedule for completion has been delayed as the City resolves issues associated with permitting and cultural resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data