Dedicated Power Line in Abia
Sector: Manufacturing (Industrial) • Location: Aba, Abia, Nigeria
Source: 9News Nigeria
Geometric Power has commenced the construction of a dedicated power line to industries along the Port Harcourt Expressway. The project, costing N1.8 billion, aims to provide a stable 24-hour power supply to industrial clusters in Ukwa, enhancing their operational efficiency.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Road, Government
- Location
- Aba, Abia, Nigeria
- Updated
- 22 Jul 2026
- Source
- 9News Nigeria
ConstructChat
Ask ConstructChat about Dedicated Power Line in Abia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Geometric Power has commenced the construction of a dedicated power line to industries along the Port Harcourt Expressway. The project, costing N1.8 billion, aims to provide a stable 24-hour power supply to industrial clusters in Ukwa, enhancing their operational efficiency. |
Original sector | Energy |
Budget |
Location
Country | Nigeria |
State | Abia |
City | Aba |
Source
Source | 9News Nigeria |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Road, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
