DE/DOT: BR 3-164 on SR36 Cedar Beach Road Replacement
Planning schematics · Delaware · Last reported Sep 2024
Source: Dodge USA
Two of the project goals are to maintain the current road profile, and to keep the mechanical and electrical equipment as high as possible above the waterline. The team determined the Dutch-style bascule bridge offered a cost-effective way to meet the goals, he said.
- Status
- Prospective
- Sector
- Road, Bridge, Power Generation (CCGT), Commercial
- Location
- Cedar Creek, Delaware, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DE/DOT: BR 3-164 on SR36 Cedar Beach Road Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Two of the project goals are to maintain the current road profile, and to keep the mechanical and electrical equipment as high as possible above the waterline. The team determined the Dutch-style bascule bridge offered a cost-effective way to meet the goals, he said. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Delaware |
City | Cedar Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Power Generation (CCGT), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
