DE/DOT: SR 4 Christina Pkwy (Elkton Rd to SR 896)
Sector: Cement • Location: Newark, Delaware, United States of America
Source: Dodge USA
Reconstruct concrete pavement and widen to provide two continuous lanes on SR 4 in both directions. Widen existing structures over Christina River and railroad
- Status
- Prospective
- Sector
- Cement, Rail, Road, Commercial, Manufacturing (Industrial)
- Location
- Newark, Delaware, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DE/DOT: SR 4 Christina Pkwy (Elkton Rd to SR 896)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruct concrete pavement and widen to provide two continuous lanes on SR 4 in both directions. Widen existing structures over Christina River and railroad |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Delaware |
City | Newark |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Rail, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
