logo
ProjectClosed

Deep Injection Well Transmission Main Phase IIIA

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge

The City of Marathon is installing approximately 5,010 linear feet of 16 DR 11 HDPE with five plug valves via directional drill method of installation beginning at the south side of the Robert H. Dopps Bridge on Coco Plum Drive and running southeast down Coco Plum Drive to the corner of Avenue I and Coco Plum Drive where the Area 6 Wastewater Treatment Facility is located at 100 Avenue I. Work inc

Status
Closed
Sector
Water Supply and Storage, Government, Bridge, Waste Processing and Treatment, Commercial
Location
Marathon, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Deep Injection Well Transmission Main Phase IIIA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Deep Injection Well Transmission Main Phase IIIA” is an infrastructure initiative in the Water Supply and Storage sector, located in Marathon, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Marathon is installing approximately 5,010 linear feet of 16 DR 11 HDPE with five plug valves via directional drill method of installation beginning at the south side of the Robert H. Dopps Bridge on Coco Plum Drive and running southeast down Coco Plum Drive to the corner of Avenue I and Coco Plum Drive where the Area 6 Wastewater Treatment Facility is located at 100 Avenue I. Work includes the procurement and installation of five 16 plug valves, along with the necessary fittings ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Marathon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Bridge, Waste Processing and Treatment, Commercial

Article published date

2025-09-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project