logo

Deep Tunnel Sewerage System (DTSS) Phase 2 Project in Singapore

Sector: Tunnel • Location: Singapore

Source: Highways Today

Project
Ongoing

ZÜBLIN, a subsidiary of European-based construction group STRABAG SE, has been hired by PUB, Singapore’s national water agency, to build 11.9 km of tunnels for the sewerage system of the city. The contract is a part of the Deep Tunnel Sewerage System (DTSS) Phase 2 project and worth €309 million. Construction is scheduled to start in March 2018 and will be finished in September 2023. Four tunnel b

Project Information FAQ

Project Information

5 Q
The project “Deep Tunnel Sewerage System (DTSS) Phase 2 Project in Singapore” is an infrastructure initiative in the Tunnel sector, located in Singapore, Singapore. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ZÜBLIN, a subsidiary of European-based construction group STRABAG SE, has been hired by PUB, Singapore’s national water agency, to build 11.9 km of tunnels for the sewerage system of the city. The contract is a part of the Deep Tunnel Sewerage System (DTSS) Phase 2 project and worth €309 million. Construction is scheduled to start in March 2018 and will be finished in September 2023. Four tunnel boring machines will trench to give three-and-a-half to six metre wide tunnels. The DTSS uses deep tunnel sewers to convey waste water by gravity to centralised water treatment plants, where the waste water is cleaned. The whole DTSS project is divided into two phases. Phase one was completed in 2008, where ZÜBLIN successfully constructed one section of the project. Phase two will be completed in 2025. Upon completion, Singapore will have an additional conveyance system that is made up of 60 km of link sewers and 40 km of deep tunnels.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data