Deepening of the fairway of the Upper Main
Sector: Water Supply and Storage • Location: Germany
Source: Keep.EU
NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Main is 524 km long, of which 388 km are navigable. The Main connects the Rhine and the Danube via the Main-Danube Canal and is therefore an important part of the inland waterway network of the Danube Region. All measures concerning the upgrade of the waterway infrastructure at the Main are thus beneficial for the transport on the Danube as
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Main is 524 km long, of which 388 km are navigable. The Main connects the Rhine and the Danube via the Main-Danube Canal and is therefore an important part of the inland waterway network of the Danube Region. All measures concerning the upgrade of the waterway infrastructure at the Main are thus beneficial for the transport on the Danube as well. Currently, the fairway depth is. 2.5 m at the Upper Main. OBJECTIVE(S) OF THE PROJECT: The upgrade of the Upper Main to class Vb is intended to enable a fairway depth of. 2.9m, increasing the possible depth by 4 dm. The fairway width is intended to be increased from 36m to 40m. CONDUCTED AND PLANNED PROJECT ACTIVITIES: Planning, approval and construction phases are conducted subsequently for different sections and are expected to be completed by. 2020. - Würzburg (concluded). - Randersacker/Goßmannsdorf (concluded). - Marktbreit/Kitzingen (concluded). - Dettelbach/Gerlachshausen (concluded). - Wipfeld/Garstadt/Schweinfurt. - Ottendorf and Knetzgau. - Limbach/Viereth (concluded). - (c) Wasserstraßen-Neubauamt Aschaffenburg. Works from Würzburg (Main km 252) to Wipfeld (Main km 316) have already been completed. Also the impoundment between Limbach and Viereth is already completed. The deepening of the fairway between Wipfeld and Limbach is ongoing and financing is secured. Planned: Implementation of the remaining sections Wipfeld-Garstadt-Schweinfurt and Ottendorf-Knetzgau. TRANSBOUNDARY IMPACT: The Main connects the Danube and the Rhine via the Main-Danube Canal. The result of the works will be an increase in transnational transports along the Rhine-Main-Danube axis. PROJECT BENEFICIARIES / TARGET GROUPS: waterway users. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
