logo

Deepening of the fairway of the Upper Main

Sector: Water Supply and Storage • Location: Germany

Source: Keep.EU

Project
Closed

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Main is 524 km long, of which 388 km are navigable. The Main connects the Rhine and the Danube via the Main-Danube Canal and is therefore an important part of the inland waterway network of the Danube Region. All measures concerning the upgrade of the waterway infrastructure at the Main are thus beneficial for the transport on the Danube as

Project Information FAQ

Project Information

5 Q
The project “Deepening of the fairway of the Upper Main” is an infrastructure initiative in the Water Supply and Storage sector, located in Germany. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Main is 524 km long, of which 388 km are navigable. The Main connects the Rhine and the Danube via the Main-Danube Canal and is therefore an important part of the inland waterway network of the Danube Region. All measures concerning the upgrade of the waterway infrastructure at the Main are thus beneficial for the transport on the Danube as well. Currently, the fairway depth is. 2.5 m at the Upper Main. OBJECTIVE(S) OF THE PROJECT: The upgrade of the Upper Main to class Vb is intended to enable a fairway depth of. 2.9m, increasing the possible depth by 4 dm. The fairway width is intended to be increased from 36m to 40m. CONDUCTED AND PLANNED PROJECT ACTIVITIES: Planning, approval and construction phases are conducted subsequently for different sections and are expected to be completed by. 2020. - Würzburg (concluded). - Randersacker/Goßmannsdorf (concluded). - Marktbreit/Kitzingen (concluded). - Dettelbach/Gerlachshausen (concluded). - Wipfeld/Garstadt/Schweinfurt. - Ottendorf and Knetzgau. - Limbach/Viereth (concluded). - (c) Wasserstraßen-Neubauamt Aschaffenburg. Works from Würzburg (Main km 252) to Wipfeld (Main km 316) have already been completed. Also the impoundment between Limbach and Viereth is already completed. The deepening of the fairway between Wipfeld and Limbach is ongoing and financing is secured. Planned: Implementation of the remaining sections Wipfeld-Garstadt-Schweinfurt and Ottendorf-Knetzgau. TRANSBOUNDARY IMPACT: The Main connects the Danube and the Rhine via the Main-Danube Canal. The result of the works will be an increase in transnational transports along the Rhine-Main-Danube axis. PROJECT BENEFICIARIES / TARGET GROUPS: waterway users.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data