Deer Island Basin Complex Tidal Wetlands Restoration Project
The status, timeline and source of this project. A free account opens every field.
Source: Marin County Department of Public Works (DPW)
Construction of this first phase of the project is made possible through grants from the National Fish and Wildlife Foundation and San Francisco Bay Restoration Authority. The project team has actively consulted the San Francisco Bay Restoration Regulatory Integration Team (BRRITT) which coordinates permit applications for the project. This included site tours with key regulators and multiple rou
- Status
- Prospective
- Sector
- Water Supply and Storage, Road
- Location
- California, United States of America
- Updated
- 19 Nov 2026
- Source
- Marin County Department of Public Works (DPW)
ConstructChat
Ask ConstructChat about Deer Island Basin Complex Tidal Wetlands Restoration Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of this first phase of the project is made possible through grants from the National Fish and Wildlife Foundation and San Francisco Bay Restoration Authority. The project team has actively consulted the San Francisco Bay Restoration Regulatory Integration Team (BRRITT) which coordinates permit applications for the project. This included site tours with key regulators and multiple rounds of project design discussion and comment. Soliciting early input from regulators has been an asset to informing the project’s permitting approach. During the past century, former tidal marshes at Deer Island Basin have been diked, drained, and converted to pasture. The District proposes to restore ecologically valuable tidal wetlands for endangered species and to improve tidal connectivity to the diked areas that were historically tidal wetlands along Novato Creek. The first Phase of the Project is to restore the Bird Ponds. The District’s Deer Island Basin Complex is located in the lower Novato Creek watershed just north of Highway 37. It includes two stormwater ponds, Heron’s Beak Pond and Duck Bill Pond (aka the "Bird Ponds") along the south side of Novato Creek, as well as the Deer Island Basin on the north side of Novato Creek. |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Marin County Department of Public Works (DPW) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-05-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
