logo

Degirmendere, Karacay, Kuzuculu HPPs - Group 11

Sector: Hydro • Location: Turkey

Source: World Bank Group

Project
Active

On March 2nd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish energy firm Ka-Fnih Enerji Uretim a 49 year concession granting the operating rights of three mini hydro power plants, known as Group 11 and with a total capacity of 1.172 MW. The capacity of the minihydro power plants were 0.5 MW Degirmendere, 0.4MW Karacay, 0.272MW Kuzucul

Project Information FAQ

Project Information

4 Q
The project “Degirmendere, Karacay, Kuzuculu HPPs - Group 11” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On March 2nd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish energy firm Ka-Fnih Enerji Uretim a 49 year concession granting the operating rights of three mini hydro power plants, known as Group 11 and with a total capacity of 1.172 MW. The capacity of the minihydro power plants were 0.5 MW Degirmendere, 0.4MW Karacay, 0.272MW Kuzuculu plant, located in Osmaniye and Hatay, Turkey. The plants were transferred under the Transfer of Operating Rights (TOR) scheme for 49 years, years with no investment obligations to expand or rehabilitate the power plant. Based on this information, the project was classified as a lease contract in the PPI Database. The project was expected to sell electricity produced in the liberalized electricity market in Turkey. In June 2010, Ka-Fnih Enerji Uretim won the operating rights of Group 11 mini hydro plants in an open tender held for 49-year operating rights by offering US$7.02 million in the public auction. The tender of this power plant received 20 bids in total. The tender, which were conducted by competitive bidding, followed the sale of other groups that started in May from the same tender that ended in February. Group 11 was one of the 19 groups of small and medium hydro power plants which OIB tendered to private consortia in February 2010. The 19 groups comprised a total of 52 small and medium size hydro power generation plants which were owned by state-owned power firm Elektrik Uretim A.S. (EUAS) and had a total capacity of 141 MW. A group had between one and five dams and were grouped based on their geographical proximity. The 19 groups were auctioned in by competitive bidding attracting 615 bids. The privatization process of most of the 19 groups concluded in 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data