Deitrick Road Outfall Restoration
Sector: Water Supply and Storage • Location: Tuckahoe, Virginia, United States of America
Source: Dodge USA
The Work consists of an outfall restoration for the site which will include an existing and restored reach length of 160 linear feet (LF). The restoration will utilize Natural Channel Design (NCD) techniques, the channel will be restored by utilizing priority level 2, raising the stream bed slightly and creating a bankfull bench within the confined valley. The banks along the floodplain of the con
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT)
- Location
- Tuckahoe, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Deitrick Road Outfall Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of an outfall restoration for the site which will include an existing and restored reach length of 160 linear feet (LF). The restoration will utilize Natural Channel Design (NCD) techniques, the channel will be restored by utilizing priority level 2, raising the stream bed slightly and creating a bankfull bench within the confined valley. The banks along the floodplain of the confined channel will be graded back allowing for 2:1 slopes, creating greater stability. A B4a chan... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Tuckahoe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
