Del Mar Crest Canyon Conversion (UUD X1A)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The City of Del Mar seeks a bid from qualified contractors for construction of the Crest Canyon Conversion (UUD X1A) (Work). The Work generally consists of trenching, conduit installation, handhole installation, equipment pad installation, trench backfill and resurfacing, grading, retaining wall installation and backfill, and landscape restoration related to the undergrounding of overhead utilitie
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Government
- Location
- Del Mar, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Del Mar Crest Canyon Conversion (UUD X1A)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Del Mar seeks a bid from qualified contractors for construction of the Crest Canyon Conversion (UUD X1A) (Work). The Work generally consists of trenching, conduit installation, handhole installation, equipment pad installation, trench backfill and resurfacing, grading, retaining wall installation and backfill, and landscape restoration related to the undergrounding of overhead utilities on San Dieguito Dr., Oribia Rd., Serpentine Dr., Zuni Dr., Avenida Primavera, 15th St., Crest R... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Del Mar |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
