Del Mar/Downtown Underground Utility Modification Phase 1&2
Sector: Consumer Products • Location: San Clemente, California, United States of America
Source: Dodge USA
Modifications to the Del Mar/Downtown Underground Utility Districts No. 02-01and 02-02The Del Mar Phase I and Phase 2 Underground Utility Districts No. 02-01 and02-02 were established to convert overhead utilities within the publicright-of-way to underground facilities within the area generally bounded byAvenida Cabrillo, Avenida Del Mar, Avenida Granada, the Community Center and ElCamino Real. Th
- Status
- Prospective
- Sector
- Consumer Products, Tunnel, Government, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- San Clemente, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Del Mar/Downtown Underground Utility Modification Phase 1&2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Modifications to the Del Mar/Downtown Underground Utility Districts No. 02-01and 02-02The Del Mar Phase I and Phase 2 Underground Utility Districts No. 02-01 and02-02 were established to convert overhead utilities within the publicright-of-way to underground facilities within the area generally bounded byAvenida Cabrillo, Avenida Del Mar, Avenida Granada, the Community Center and ElCamino Real. The utility undergrounding is being designed by and will be conducted by San Diego Gas & Electric S... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Clemente |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Tunnel, Government, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
